Differences between revisions 2 and 3
Revision 2 as of 2009-04-07 01:18:07
Size: 1068
Editor: l4-m2
Comment:
Revision 3 as of 2009-04-07 03:15:43
Size: 1403
Editor: DN0a2193ac
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
Summarize the task performed by this module in a couple sentences For a given time, this pipeline module first searches for the low-noise remapped LOS magnetogram at the
given time (produced by the module B_LOS-Remap_and_Average) and the LOS synoptic Carrington map centered at the given time
(produced by the module B_LOS-CarringtonMap), then converts the synoptic Carrington map
to the synchronic heliographic may by correcting the effect of differential rotation, and finally merges
the magnetogram into the synchronic map to produce the LOS synchronic frame at the specific time.
 
===== Module Inputs =====
Line 5: Line 11:
===== Module Inputs =====
 . List inputs here
A specific time associated with large-scale dynamic phenomena
Line 9: Line 14:
 . List outputs here
The LOS synchronic frame at the specific time, as a
proxy of the instatanioues entire-surface LOS field distribution at the time.
 
Line 12: Line 20:
 . Indicate nominal cadence on which module is run
The time scale of the interested large-scale dynamic phenomena
Line 15: Line 24:
 . Indicate if/when products are archived
No
Line 18: Line 28:
 . Indicate if there are any options when running the code   
Line 21: Line 32:
 . Indicate estimate of percentage complete for the module   70% complete
Line 24: Line 36:
 . Name heritage or percent complete for Basic Code   95% complete for IDL and 0% for Fortran
Line 27: Line 40:
 . Indicate status of DRMS module version of module   No
Line 31: Line 45:
  * List issues that still need to be resolved
  * Describe as many as you like
Transform IDL code to Fortrain code
Line 35: Line 48:
 . Give name of local coordinator for development of this module  

HMI Pipeline Module - Module_Name_Here

For a given time, this pipeline module first searches for the low-noise remapped LOS magnetogram at the given time (produced by the module B_LOS-Remap_and_Average) and the LOS synoptic Carrington map centered at the given time (produced by the module B_LOS-CarringtonMap), then converts the synoptic Carrington map to the synchronic heliographic may by correcting the effect of differential rotation, and finally merges the magnetogram into the synchronic map to produce the LOS synchronic frame at the specific time.

Module Inputs

A specific time associated with large-scale dynamic phenomena

Module Outputs

The LOS synchronic frame at the specific time, as a proxy of the instatanioues entire-surface LOS field distribution at the time.

Cadence

The time scale of the interested large-scale dynamic phenomena

Archive

No

Options

Overall Status of Module

70% complete

Status of Code

95% complete for IDL and 0% for Fortran

Status of DRMS module

No

Issues needing resolution

Transform IDL code to Fortrain code

Responsible scientist

Xuepu Zhao, J. Todd Hoeksema

Remarks


  • Back to ["HMIModuleTable"]
  • Back to FrontPage

JsocWiki: B_LOS-SynchronicFrame (last edited 2013-05-01 04:35:26 by localhost)