Size: 1403
Comment:
|
Size: 2891
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
---- /!\ '''Edit conflict - other version:''' ---- |
|
Line 43: | Line 45: |
---- /!\ '''Edit conflict - your version:''' ---- For a given time, this pipeline module first searches for the low-noise remapped LOS magnetogram at the given time (produced by the module B_LOS-Remap_and_Average) and the LOS synoptic Carrington map centered at the given time (produced by the module B_LOS-CarringtonMap), then converts the synoptic Carrington map to the synchronic heliographic map by correcting the effect of differential rotation, and finally merges the magnetogram into the synchronic map to produce the LOS synchronic frame at the specific time. ===== Module Inputs ===== A specific time associated with large-scale dynamic phenomena ===== Module Outputs ===== The LOS synchronic frame at the specific time, as a proxy of the instatanioues entire-surface LOS field distribution at the time. ===== Cadence ===== The time scale of the interested large-scale dynamic phenomena ===== Archive ===== No ===== Options ===== ===== Overall Status of Module ===== 70% complete ===== Status of Code ===== 95% complete for IDL and 0% for Fortran ===== Status of DRMS module ===== No ---- /!\ '''End of edit conflict''' ---- |
|
Line 45: | Line 90: |
---- /!\ '''Edit conflict - other version:''' ---- |
|
Line 49: | Line 96: |
---- /!\ '''Edit conflict - your version:''' ---- Transform IDL code to Fortrain code ===== Responsible scientist ===== ---- /!\ '''End of edit conflict''' ---- |
HMI Pipeline Module - Module_Name_Here
Edit conflict - other version:
For a given time, this pipeline module first searches for the low-noise remapped LOS magnetogram at the given time (produced by the module B_LOS-Remap_and_Average) and the LOS synoptic Carrington map centered at the given time (produced by the module B_LOS-CarringtonMap), then converts the synoptic Carrington map to the synchronic heliographic may by correcting the effect of differential rotation, and finally merges the magnetogram into the synchronic map to produce the LOS synchronic frame at the specific time.
Module Inputs
A specific time associated with large-scale dynamic phenomena
Module Outputs
The LOS synchronic frame at the specific time, as a proxy of the instatanioues entire-surface LOS field distribution at the time.
Cadence
The time scale of the interested large-scale dynamic phenomena
Archive
No
Options
Overall Status of Module
70% complete
Status of Code
95% complete for IDL and 0% for Fortran
Status of DRMS module
No
Edit conflict - your version:
For a given time, this pipeline module first searches for the low-noise remapped LOS magnetogram at the given time (produced by the module B_LOS-Remap_and_Average) and the LOS synoptic Carrington map centered at the given time (produced by the module B_LOS-CarringtonMap), then converts the synoptic Carrington map to the synchronic heliographic map by correcting the effect of differential rotation, and finally merges the magnetogram into the synchronic map to produce the LOS synchronic frame at the specific time.
Module Inputs
A specific time associated with large-scale dynamic phenomena
Module Outputs
The LOS synchronic frame at the specific time, as a proxy of the instatanioues entire-surface LOS field distribution at the time.
Cadence
The time scale of the interested large-scale dynamic phenomena
Archive
No
Options
Overall Status of Module
70% complete
Status of Code
95% complete for IDL and 0% for Fortran
Status of DRMS module
No
End of edit conflict
Issues needing resolution
Edit conflict - other version:
Transform IDL code to Fortrain code
Responsible scientist
Edit conflict - your version:
Transform IDL code to Fortrain code
Responsible scientist
End of edit conflict
Xuepu Zhao, J. Todd Hoeksema
Remarks
- Back to ["HMIModuleTable"]
Back to FrontPage