These tables provide more information about HMI pipeline processing modules.
|
|
||||||||||||
HMI Pipeline -- Module Table |
|||||||||||||
|
|
||||||||||||
Vector Magnetic Field Modules |
|
||||||||||||
|
|
||||||||||||
|
Module Link |
Input |
Output |
Typical Cadence |
Options |
Archive |
Status |
Heritage / Module Name |
DRMS |
Issues |
Coordinator |
Remarks |
Priority/Need Date |
V1 |
Time, duration, Lev1 Filtergrams (on CCD coordinates) |
Time-Averaged IQUV (on CCD coordinates) |
12 Minutes |
Duration, Filtering |
No |
Stage 3 |
HMI Calibration |
No |
Temporal Anti-aliasing filter |
J. Schou |
Remap includes geometry and vector transform. See A1. |
High June |
|
V2 |
IQUV (on CCD coordinates) |
Bvec=Btotal,FF, inclination, azimuth(180), uncertainties (on CCD coordinates) |
12-minute |
Quick,Threshold |
Yes |
Stage 3 |
90% |
60% |
Earlier JSOC version worked |
R. Bogart, S. Tomczyk, J. Borrero, Y. Liu |
Disk/CCD geometry, angles relative to Line of Sight |
High July |
|
V3 |
Bvec (on CCD coordinates) |
360 Azimuth, uncertainty (on CCD coordinates) |
12-minute |
Patch,FD,Quick |
Yes |
Stage 2 |
80% |
50% |
Averaging vs. Sampling |
T. Hoeksema |
Disk/CCD geometry, angles relative to line of sight |
High July/August |
|
V4 |
Assorted Bvec |
Bvec |
12-minute |
Options |
Yes |
Stage 1 |
Code |
DRMS |
Issues |
L. Svalgaard |
Assemble Vector Magnetogram from Heterogeneous Sources |
Low December |
|
V5 |
Bvec (on CCD coordinates) |
Bx,By,Bz; Uncertainties (local on a 2D projection plate with the solar north up) |
On Export |
Options |
No |
Stage 1 |
Code |
DRMS |
Issues |
Y. Liu |
Local heliocentric equatorial rectilinear vector B components for ARPs |
Medium October |
|
V6 |
Bvec (on CCd coordinates) |
Br,Btheta,Bphi; Uncertainties (on heliographic coordinates) |
On Export |
Options |
No |
Stage 1 |
Code |
DRMS |
Issues |
Y. Liu |
Heliocentric equatorial spherical coordinate vector B components |
Medium October |
|
V7 |
Bvec |
Btotal, Inclination, Azimuth; Uncertainties |
On Export |
Options |
No |
Stage 1 |
Code |
DRMS |
Issues |
Y. Liu |
Btot and angles relative to heliocentric equatorial coordinates |
Medium October |
|
V8 |
Bvec, time (on CCD coordinates) |
Bvec HeliographicFrame |
12min |
Rotation Corrections |
No |
Stage 3 |
JV2Helio |
DRMS |
Differential Rotation, Vector averages |
X. Sun |
Magnetograms in Carrington and Heliographic coordinates |
Medium August |
|
V9 |
Bvec (on CCD coordinates) |
Bvec (on image coordinates with P angle removed, but retain B0 angle) |
On Export |
Anti-aliasing |
No |
Stage 3 |
DRMS |
Vector geometry |
J. Beck, X. Sun |
Better to invert averaged IQUV? |
High July |
||
V10 |
Bvec (on CCD coordinates) |
Bvec (on image coordinates with P angle removed, but retain B0 angle) |
Hours |
Duration, Mapping |
No |
Stage 3 |
DRMS |
Rotation correction, Anti-aliasing |
J. Beck, X. Sun |
Better to invert averaged IQUV? |
High July |
||
V11 |
Bvec HeliographicFrame |
Br SynopticMap |
Per rotation |
Resolution, Rotation Correction, Averaging |
Yes |
Stage 2 |
Los, makesynop |
No |
Need to balance temporal scale of map and features |
Y. Liu, X. Zhao |
Radial Field |
Medium October |
|
V12 |
Bvec Magnetograms, SynopticMap, Time |
Hourly |
Averaging, Mapping |
No |
Stage 2 |
LoS |
DRMS |
Issues |
X. Zhao, J. T. Hoeksema |
Remark |
Medium October |
||
V13 |
SynopticMap, Bvec HeliographicFrame |
Daily |
Averaging, Rotation Correction |
Yes |
Stage 2 |
LoS |
DRMS |
Resolution,Averaging,Far Side |
X. Zhao, J. T. Hoeksema |
Input to regular global coronal modeling |
Medium October |
||
V14 |
Bvec HeliographicFrame |
Vector SynopticMap |
Monthly |
Rotation Correction, Resolution |
Yes |
Stage 1 |
Code |
DRMS |
Sensibility of Global Bvec |
X. Zhao, J. T. Hoeksema |
Need to resolve users |
Low December |
|
V15 |
Smoothed Polar Field, SynopticMap |
Monthly |
Extra/Inter -polation |
Yes |
Stage 3 |
IDL |
50% |
MDI algorithm doesn't apply |
X. Sun |
Remark |
Medium October |
||
V16 |
Global Harmonic Coefficients |
On Demand |
Global,Local,Order |
Yes |
Stage 3 |
100% |
90% |
Need to use qdport |
X. Sun, X. Zhao |
Remark |
Medium October |
||
V17 |
Coronal Field Simulation |
Daily |
Options |
Yes |
Stage 2 |
100% |
95% |
Issues |
X. Sun, X. Zhao |
Remark |
Medium October |
||
V18 |
ARP Br |
Local Coronal Field |
12-minute? |
option : (1) pixel size of input map (2) which method to use? |
Yes ? |
Stage 3 |
(1)slow iterative Laplace solver, 100% (2) Green Function 100% (3) FFT method to be tested |
DRMS 95% |
Need to edit/modify a part of C-wrapper to specify patch data timely. Method 1 is slow thus will be abondoned. Probably Green-func. method be employed. |
K. Hayashi |
Potential by-product of disambiguation |
High August |
|
V19 |
Bx,By,Bz (local on a 2D projection plane with solar north up) |
Coronal Field in Cube |
Daily |
Options |
Archive |
Stage 2 |
Code |
DRMS |
Issues |
Y. Liu |
Remark |
Low January |
|
V20 |
Bx,By,Bz Time Series (local on a 2D projection plane) |
Horizontal Velocity (on local heliocentric coordinates) |
Daily |
Options |
Yes |
Stage 2.5 |
ILCT:100% |
ILCT90%DRMS |
Time interval, Experience with HMI data |
T. Hoeksema |
DAVE4VM, ILCT |
Low December |
|
V21 |
Blos Time Series (on heliographic coordinates) |
Horizontal Velocity (on heliographic coordinates) |
12min.? |
Options |
Yes ? |
Stage 3 |
FLCT100% by G.F. , Wrapper 95% by K.H. |
95%DRMS |
define the cadence (12min is ok?). |
K. Hayashi, G. Fisher |
FLCT |
Low November |
|
V22 |
Synoptic Maps |
Solar wind speed / IMF polarity |
Daily |
Options |
Archive |
Stage 2 |
50% |
50% |
New empirical function |
X. Sun, T. Hoeksema |
Remark |
Low January |
|
V23 |
ARP Bvec, Vhorizontal (local, on a 2D projection plane with solar north up) |
Plasma & Magnetic Properties |
On request |
Options |
Yes |
Stage 2 |
Code |
DRMS |
Issues |
Abbett, Wu |
Link to external group codes |
Low March |
|
V24 |
Coronal Parameters |
Daily,Monthly |
Options |
Yes |
Stage 3 and 4 |
Script PSI2JSOC:100%. Daily MHD 95 % |
95%DRMS |
Most of the codes are ready. |
K.Hayashi, J.Linker |
TVD-MUSCL, MARS-CORHEL |
Low December |
||
V25 |
Synchronic maps/frames |
Solar Wind Parameters |
Daily/Monthly |
Options |
Archive |
Stage 2 |
CORHEL |
DRMS |
Issues |
T. Hoeksema |
Coordinate with external group codes |
Low February |
|
V26 |
Bvec - ARP + Global |
Out |
(on demand) |
N/A |
No? |
Stage 1 |
(html) |
DRMS |
Issues |
K. Hayashi |
Link to external group codes |
Low March |
|
V27 |
ARP Bvec (local, on a 2D projection plane with solar north up) |
Activity Indices |
12-minute |
Options |
Yes |
Stage 1 |
Code |
DRMS |
Issues |
T. Hoeksema |
Alerts Possible |
Low December |
|
V28 |
Br Synchronic Maps/frames |
1 AU predictions |
Daily |
Options |
Yes |
Stage 1 |
Code |
DRMS |
Issues |
T. Hoeksema |
Remark |
Low December |
|
|
|
||||||||||||
Associated HMI Pipeline Modules |
|
||||||||||||
|
|
||||||||||||
|
Module Link |
Input |
Output |
Typical Cadence |
Options |
Archive |
Status |
Heritage / Module Name |
DRMS |
Issues |
Coordinator |
Remarks |
Priority/Need Date |
A1 |
HMI/AIA/EVE + Other Solar Observations |
Active Region Patch locations and boundaries |
12 minute |
Options |
Yes |
Stage 1 |
Code |
DRMS |
Interface with HEK |
T. Hoeksema |
M. Turmon, C. DeForest, J. Zhang |
High |
|
A2 |
HMI Data Product |
DRMS Dataset |
On Demand |
Size, Anti-aliasing |
No |
Stage 2 |
Code |
DRMS |
Vector Field Averaging |
L. Svalgaard |
Remark |
High July |
|
|
|
||||||||||||
Line-of-Sight Magnetic Field Modules |
|
||||||||||||
|
|
||||||||||||
|
Module Link |
Input |
Output |
Typical Cadence |
Options |
Archive |
Status |
Heritage / Module Name |
DRMS |
Issues |
Coordinator |
Remarks |
Priority/Need Date |
L1 |
Circularly polarized filtergrams (on CCD coordinates) |
Line-of-Sight Magnetogram (on CCD coordinates) |
45 seconds |
None |
Yes |
Stage 3 |
HMI Test |
DRMS |
Issues |
J. Schou, S. Couvidat |
Remark |
High June |
|
L2 |
Magnetograms (on CCD coordinates) |
Magnetogram (on CCD coordinates) |
90s |
Cadence; spatial averaging |
No |
Stage 2 |
MDI Code |
DRMS |
Issues |
E. Benevolenskaya |
Develop various options |
High July |
|
L3 |
Magnetogram (on CCD coordinates) |
Cadence |
Options |
Archive |
Stage 4 |
JV2Helio |
DRMS |
Issues |
L. Svalgaard |
Remark |
High June |
||
L4 |
Magnetograms (on CCD coordinates) |
Cadence |
Options |
Archive |
Stage 3 |
DRMS |
Issues |
J. Beck |
Remark |
High July |
|||
L5 |
Cadence |
Options |
Archive |
Stage 4 |
MDI Code |
DRMS |
Issues |
Y. Liu |
Remark |
Medium July |
|||
L6 |
Cadence |
Options |
Archive |
Stage 2 |
MDI Code |
DRMS |
Issues |
X. Zhao, T. Hoeksema |
Remark |
Medium August |
|||
L7 |
Cadence |
Options |
Archive |
Stage 2 |
MDI Code |
DRMS |
Issues |
X. Zhao, X. Sun |
Remark |
Medium August |
|||
L8a |
MDI magnetogram |
Ideal Magnetogram |
Cadence |
Resolution |
Archive |
Stage 3 |
Code |
DRMS |
Issues |
P. Scherrer |
Module needs development |
Medium September |
|
L8b |
HMI magnetogram |
Ideal Magnetogram |
Cadence |
Resolution |
Archive |
Stage 1 |
Code |
DRMS |
Issues |
P. Scherrer |
Remark |
Medium October |
|
L9 |
Magnetogram |
Mean Field |
Cadence |
Options |
Archive |
Status 2 |
Code |
DRMS |
Issues |
L. Svalgaard |
Remark |
Low January |
|
|
|
See ModuleTemplate